Tuesday, June 29, 2021

Demolition Day 2

 Master bathroom demo begins.


 


 Andrew uses a huge mallet to tear down the glass block shower enclosure.


I had to pose with my safety goggles.


Tearing out the shower tile.



Gross! There's a lot of moisture under there ...

... & wood rot!


The wood was so wet that it just crumbled!

More walls with moisture! Ugh!

Taking out the jacuzzi tub.





All of the tile is out.


Luckily, the bedroom was sealed off from dust.

Monday, June 28, 2021

Demolition Begins

 Out with the gas fireplace.


Removing the kitchen bar.

Cabinet demo





Tearing out the pantry.



Drawing behind the refrigerator.

Sealing off the Florida room.

Taking down the fireplace wall cabinets.







Sunday, June 27, 2021

Before Construction Begins

I knew I'd have to document the "before" pix of the kitchen & everything else.


Fireplace wall
 

Master bathroom


Friday, June 25, 2021

Ice Cream & New Shoes

I'm not sure who likes ice cream time more ... Evanne or the pups!

After ice cream, Stella & Google showed off their new shoes.

Tuesday, June 22, 2021

Spider, Sink & Ice Cream with Kim

There was a tiny neon green spider on my car this morning. Luckily I saw it before grabbing the door handle!


My new 150 pound kitchen sink was delivered today. I love Amazon Prime!

Kim got to give Stella ice cream today. They both look really happy!